Seamangeun South Korea (Hydraulics)
            
            
          
        
                    Prestigious water winning project in South Korea.
                    Lock gates are placed in a 33 km long dam.
                    Total 44 pcs piston rods (ø320mm x 10m) with an integrated linear measuring system are coated with CB24.
                    Lead time 4 months.
                    Project completed in 2006 and still in operation.